- -

- -

W1069 · enrolled ·on-leaveA worker's status is the most committed of their projects, or their availability: available — free to be assigned (in no project). deployed — on a job now (a project's deploy stage). pre-deployment — being mobilised (a stage before deploy). post-deployment — winding down (a stage after deploy). on-leave — declared unavailable for the current period. planned — a candidate (a planning stage).

Identity

verified manually
Given name
-
Family name
-
Date of birth
1993-08-04 (32 yrs)
Primary email address
.@example.com
Crew status on-leave

This worker has indicated through the crew availability questionnaire that they are unavailable until 2026-07-09.

Last contact 1w ago
Avg. reply time ~4h
View conversations

Extraction 18-06-2026 09:00

Status: EXTRACTION_STATE_COMPLETED completed

Designation profile

No designation matched — the extraction did not assign this worker any designation.

Documents

  • personal-details v4
    satisfied
    complete signed
  • timesheet v5
    unsatisfied
    complete signed correct-month

    ✗ signed — the artifact does not satisfy this check

  • passport v5
    expires 09-06-2028 incomplete
    not-expired untampered identity-match bsn-visible both-sides

    ? untampered — could not be determined from the available artifacts; pending primary-source confirmation

View All Extractions